Qatar Power Transmission System Expansion
Executed
Construction of new substations on different voltage levels varying from 400kV to 66kV and modifications to the existing substations.
Executed
Construction of new substations on different voltage levels varying from 400kV to 66kV and modifications to the existing substations.